A technology of prefabricated pipe piles and permanent support, which is applied in the direction of foundation structure engineering, excavation, sheet pile walls, etc., can solve the problems of weak guiding function and low utilization rate, and achieve the effects of simple structure, material saving and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] In a typical implementation of the present application, such as figure 1 As shown, a verticality guide device based on the permanent support structure prefabricated pipe pile is provided, the guide device includes a guide frame 1, the guide frame 1 is arranged on the top of the crown beam 2, and the bottom of the guide frame 1 is set for the prefabricated pipe pile Through the positioning hole, a track is provided on the lower surface of the bottom of the guide frame 1 so that the guide frame 1 can move relative to the track. The positioning hole 4 in the guide device is aligned up and down with the reserved through hole on the crown beam 2. After the prefabricated pipe pile is fixed through the positioning hole 4 and the reserved through hole through the crown beam 2, the pile is driven by the piling mechanism. Compared with the traditional The piling method is faster and the construction is more convenient. In addition, multiple guide frames 1 can be set at the same t...
Embodiment 2
[0053] The construction method of the permanent support structure of the foundation pit, the specific steps are as follows:
[0054] 1) The crown beam is positioned and poured, and through holes are reserved on the crown beam for the passage of prefabricated pipe piles; The pile position requires precise positioning;
[0055] 2) The verticality guide device based on the permanent support structure prefabricated pipe pile is set at the through hole of the crown beam, and the positioning hole of the verticality guide device cooperates with the through hole to fix the prefabricated pipe pile;
[0056] 3) Remove the above-mentioned verticality guide device, seal the through hole of the crown beam, and use fine stone concrete one grade higher than the crown beam structure for the sealing and pouring.
[0057] In said step 2), a method for setting the verticality guide device based on the permanent support structure prefabricated pipe pile is as follows: