Method for cooperative office by using task tree mode
A collaborative office, tree mode technology, applied in office automation, data processing applications, instruments, etc., can solve problems such as reduced work efficiency, managers cannot monitor in real time, and implementers cannot accept work tasks in a timely manner, so as to avoid forgetting after the event. Avoid fragmented information, avoid cumbersome and complex effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] A method for collaborative office using a task tree mode, comprising the following steps:
[0025] Create a task table: take a project or transaction as the general task, and set the specific description of the task;
[0026] Establishment of personnel table and association table: decompose the total task in the task table into first-level subtasks, and set the specific description of the first-level subtasks; establish the personnel table, by assigning the first-level subtasks to the corresponding first-level subtasks The executor, associate the personnel table and the task table with each other; the implementer of the first-level subtasks continues to decompose the first-level subtasks into second-level subtasks, and assigns them to the corresponding second-level subtask implementers; continue to assign grades until the task reaches The last level of task implementers, so as to improve the association table;
[0027] Task submission and assessment: Task implementers ...
Embodiment 2
[0029] A method for collaborative office using a task tree mode, comprising the following steps:
[0030] Create a task table: take a project or transaction as the general task, and set the specific description of the task;
[0031] Establishment of personnel table and association table: decompose the total task in the task table into first-level subtasks, and set the specific description of the first-level subtasks; establish the personnel table, by assigning the first-level subtasks to the corresponding first-level subtasks The executor, associate the personnel table and the task table with each other; the implementer of the first-level subtasks continues to decompose the first-level subtasks into second-level subtasks, and assigns them to the corresponding second-level subtask implementers; continue to assign grades until the task reaches The last level of task implementers, so as to improve the association table;
[0032] Task submission and assessment: Task implementers ...
Embodiment 3
[0035] A method for collaborative office using a task tree mode, comprising the following steps:
[0036] Create a task table: take a project or transaction as the general task, and set the specific description of the task;
[0037] Establishment of personnel table and association table: decompose the total task in the task table into first-level subtasks, and set the specific description of the first-level subtasks; establish the personnel table, by assigning the first-level subtasks to the corresponding first-level subtasks The executor, associate the personnel table and the task table with each other; the implementer of the first-level subtasks continues to decompose the first-level subtasks into second-level subtasks, and assigns them to the corresponding second-level subtask implementers; continue to assign grades until the task reaches The last level of task implementers, so as to improve the association table;
[0038] Task submission and assessment: Task implementers ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com