Filling and protection synchronized construction method for hydraulic fill construction
A technology of blowing and filling construction and construction methods, applied in soil protection, infrastructure engineering, construction and other directions, can solve problems such as affecting the construction progress and increasing the construction cost of the project, so as to improve the construction efficiency, reduce the project cost, and make full use of the site. The effect of resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The specific embodiments of the present invention will be further described in detail below.
[0026] A simultaneous filling and enclosure construction method for dredging filling construction, characterized in that: the method includes the following steps:
[0027] (1) Preparation for starting work:
[0028] Carry out water depth measurement in the construction area to determine the position of the cutter suction vessel;
[0029] On-site drilling and sampling of the geology to determine the soil quality;
[0030] Soil slope ratio Silt, silt 1:100~1:300 fine sand 1:50~1:100 Middle sand 1:25~1:50 coarse sand 1:10~1:25 gravel 1:5-1:10
[0031] (2) Filling by cutter suction vessel
[0032] After the above-mentioned pipeline layout is completed, the cutter suction ship enters the site for blow-filling construction;
[0033] The elevation of the beach to be formed exceeds the average high water level by 1m, and the slope toe ...