Construction method for salty soil district railway roadbed with water content lower than liquid limit
A technology of railway subgrade and construction method, applied in the directions of roads, roads, buildings, etc., can solve the problems of high freight, poor economy, long distance, etc., and achieve the effects of improving service life, reducing rising height, and preventing salinization.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The following embodiments can describe the present invention in more detail:
[0026] a. Subgrade Surface Treatment
[0027] Remove the super-salt soil layer, salt crust and salt frost on the surface with a thickness of 0.5m. The base salt crust and the soil with salt content exceeding the allowable value are all removed and discarded at the lower side of the line. The removed salt The soaked soil should be treated as spoil, and discarded to a depression 100m away from the slope foot of the embankment, so as to prevent the water flow from washing the salt stains back into the embankment and corroding the embankment. It is 0.5m, and the YZ20T road roller is used to compact the pavement after leveling;
[0028] b. Test the saline soil soil in the soil borrowing site
[0029] Sampling and testing the saline soil filling in the borrow field, every 1000m 3 One set of tests shall be made for the filler, and 3 soil samples shall be taken for each set. If the amount of soil ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 