Lining trolley used for construction of main tunnel and emergency avoidance zone and its construction method
A technology of lining trolley and construction trolley, which is applied in the direction of shaft lining, tunnel lining, earthwork drilling and mining, etc., can solve the problems of long reconstruction time, long time-consuming, complicated process, etc., to improve construction efficiency, improve work efficiency, The effect of simplifying the assembly process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] see Figure 1-Figure 8 , a lining trolley used for construction of a main cave and an emergency vehicle avoidance belt, comprising a trolley body, the trolley body includes a main cave construction trolley body 1 and a detachable type with the main cave construction trolley body 1 Attachment 2 for the construction of the connected emergency avoidance belt, see figure 2 .
[0070] The structure of the main hole construction trolley body 1 is detailed in figure 1 , specifically including a formwork part 1.1, a door frame part 1.2, a connecting part 1.3 connecting the formwork part 1.1 and the door frame part 1.2, and a running mechanism 1.4, the details are as follows:
[0071] The template part 1.1 includes a left template group 1.11, a left top template group 1.12, a right top template group 1.13, and a right template group 1.14 that are flexibly connected in sequence. Here, the left top template group 1.12 and the right top template group The formwork group 1.13 al...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


