The installation method of the pipeline bridge across the canyon

An installation method and technology for pipeline bridges, which are applied in bridges, bridge applications, bridge construction, etc., can solve the problems of long construction period, difficult quality control, poor safety, etc., and achieve the effect of compressing construction period, saving construction cost, and easy quality control.

Active Publication Date: 2018-10-09
中石化江苏油建工程有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Faced with the construction task of pipeline bridges that need to cross both sides of the canyon, if the traditional technology is used for construction, firstly, the construction period is too long, which will affect the overall construction progress of the oil and gas pipeline; secondly, the cost of erecting full house scaffolding is too high; High-altitude operations, poor safety, difficult quality control, and the most critical thing is that it is difficult to find large-scale lifting equipment that meets the requirements on the construction site

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The installation method of the pipeline bridge across the canyon
  • The installation method of the pipeline bridge across the canyon
  • The installation method of the pipeline bridge across the canyon

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Such as Figure 1 to Figure 9 As shown, the installation method of the pipeline bridge across the canyon of the present invention comprises the following steps in turn: (1) measuring and setting out the line, determining the crossing line L1 on the canyon section, and determining the positions of the left pier 1 and the right pier 2 on the left and right banks of the canyon , the left pier 1 and the right pier 2 are located on the spanning line L1; (2) the left pier 1 and the right pier 2 are poured on the left and right banks of the canyon, and the pipe bridge connection embedded parts are respectively anchored on the tops of the left pier 1 and the right pier 2; (3) Define the sending line L2 parallel to the crossing line L1 on the front or rear side of the crossing line L1, and the center distance between the sending line L2 and the crossing line L1 is 1.2 to 1.5 times the width of the pipeline bridge 5; (4) In the canyon Make the pipeline bridge 5 on the left bank, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an installation method of a pipeline bridge crossing a canyon. The method comprises the steps of 1, surveying and setting-out, wherein a crossing line is determined on a canyon cross section, positions of left and right bridge piers at left and right banks of the canyon are determined, and the left and right bridge piers are located at the crossing line; 2, pouring the left and right bridge piers at the left and right banks of the canyon, wherein pipeline bridge connecting built-in fittings are anchored at the tops of the left and right bridge piers respectively; 3, determining a sending line parallel to the crossing line at the front side or rear side of the crossing line, wherein the center distance between the sending line and the crossing line is 1.2-1.5 folds of the width of the pipeline bridge; 4, manufacturing the pipeline bridge at the left bank of the canyon and mounting a sending device in the middle of the canyon bottom of the canyon, wherein both the pipeline bridge and the sending device are located at the sending line; 5, making the pipeline bridge cross the canyon along the sending line; 6, transferring the pipeline bridge horizontally with a crane to the crossing line and fixing the pipeline bridge on the left and right bridge piers. According to the installation method of the pipeline bridge crossing the canyon, pipeline bridge crossing can be completed in canyon areas where there is no heavy cranes, and the method is short in construction period, low in manufacturing cost and high in safety.

Description

technical field [0001] The invention relates to a pipeline bridge, in particular to an installation method for a pipeline bridge spanning a canyon, and belongs to the technical field of pipeline bridge construction. Background technique [0002] To cross the canyon for oil and gas pipelines, first a pipeline bridge across the two sides of the canyon must be installed, and then the pipeline will be laid along the pipeline bridge. The traditional construction method of the pipeline bridge across the canyon requires scaffolding to be erected along the cross-section of the canyon, and the scaffolding needs to be erected from one side of the canyon to the opposite bank, commonly known as erecting full house scaffolding. Then the pipeline bridge will be manufactured and installed on the full house scaffolding. The welding team will work at high altitude above the canyon, supplemented by a crane with a large lifting capacity to cooperate with the construction. This conventional con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D18/00
CPCE01D18/00E01D21/00
Inventor 戚国顺黄国王浩姜偲王振家
Owner 中石化江苏油建工程有限公司