Wind power partition electricity price estimation method based on peak load regulation auxiliary service compensation
A wind power and peak shaving technology, applied in wind power generation, electrical components, circuit devices, etc., can solve problems such as cost disconnection, wind curtailment and power limit
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0057] image 3 , 4 Predict the power curve P of wind power for a certain day in a certain place in central China w (t) and load forecast curve P d (t), take this as an example for illustration.
[0058] 1. Collect the conventional technical parameters of the power grid at the receiving end, and obtain the start-up and shutdown plan of the thermal power unit for the next day U i (t), wind power forecast power curve P w (t) if image 3 , Grid load forecast curve P d (t) if Figure 4 , calculating the lower limit of technical output of the power grid system and the lower limit of free peak regulation;
[0059] The conventional technical parameters of the receiving end power grid include the total number of thermal power units N g , the output upper and lower limits P of each thermal power unit i i max ,P i min , up and down ramp rate R Ui , R Di , the lower limit of free peak shaving Pi TF ; Including the number of pumped storage units N p , the upper and lower l...
Embodiment 2
[0080] Figure 7 , 8 is the load forecast curve P for a certain day in a certain place in Central China d (t) and wind power forecast power curve P w (t), take this as an example for illustration.
[0081] 1. Collect the conventional technical parameters of the power grid at the receiving end, and obtain the start-up and shutdown plan of the thermal power unit for the next day U i (t), wind power forecast power curve P w (t) if Figure 7 , Grid load forecast curve P d (t) if Figure 8 , calculating the lower limit of technical output of the power grid system and the lower limit of free peak regulation;
[0082] The conventional technical parameters of the receiving end power grid include the total number of thermal power units N g , the upper and lower limits P of the technical output of each thermal power unit i i max ,P i min , up and down ramp rate R Ui , R Di , the lower limit of free peak shaving P i TF ; Including the number of pumped storage units N p , t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com