Fully automatic true-triaxial tunnel and underground construction model testing system
A model test, underground engineering technology, applied in the direction of elasticity test, machine/structural component test, and material strength test by applying stable tension/pressure, which can solve the problem of uneven stress on the specimen and lack of tunnel water inrush disasters. Precursor information monitoring model test system, large human and material resources, etc., to achieve the effect of saving human, material and financial resources, simple and convenient testing, and good loading capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
[0080] It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and / or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and / or combinations thereof.
[0081] As introduced in the background technology, there are following problems in the prior art:
[0082] (1) ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


