A progress monitoring method for laboratory engineering construction

A laboratory and engineering technology, applied in data processing applications, special data processing applications, instruments, etc., can solve problems such as low monitoring efficiency, difficulty in timely warning of project progress lag, and inability to view the current progress in real time, so as to improve efficiency and realize The effect of automation
CN107273587BActive Publication Date: 2019-01-01北京戴纳实验科技有限公司

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
北京戴纳实验科技有限公司
Publication Date
2019-01-01

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a progress monitoring method used for laboratory engineering construction. The method comprises the steps of: creating a building information model of a laboratory, wherein the building information model comprises a 3D building model, and the 3D building model comprises a component model; creating information of a laboratory engineering construction progress plan, and correlating the engineering construction progress plan and the component model of the 3D model; arranging an Internet-of-Things tracking device in the laboratory engineering construction, and acquiring locations of construction devices and construction materials which are tracked by the Internet-of-Things tracking device in real time and in laboratory engineering ; updating engineering construction progress according to location information of the construction devices and the construction materials; and comparing the engineering construction progress and the engineering construction progress plan, and issuing early warning information to a client when the difference between the engineering construction progress and the engineering construction progress plan is greater than a preset threshold value. The method improves the efficiency of monitoring and the level of automation.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of engineering project management, in particular to a progress monitoring method for laboratory engineering construction. Background technique

[0002] At present, manual methods are usually used to monitor the progress of laboratory engineering construction. The progress monitoring data of engineering construction is filled in and reported layer by layer. When it reaches relevant personnel, it often becomes "historical data", and the current progress cannot be checked in real time. Data deviations caused by other non-technical reasons (such as performance appraisal, profit-driven) occur from time to time. When the project progress lags behind the construction plan, there is a lack of efficient early warning measures, resulting in a passive state of project progress management. Contents of the invention

[0003] The invention provides a progress monitoring method for laboratory engineering construction, which is us...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More