Large stone crushing equipment for road construction
A kind of crushing equipment and large-scale technology, applied in the direction of using liquid separating agent, grain processing, and separation of dispersed particles, it can solve the problems of poor effect, low efficiency, time-consuming and labor-intensive, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A large stone crushing equipment for road construction, such as Figure 1-6 As shown, it includes bottom plate 1, left frame 2, top plate 3, lifting device 4, lifting rod 5, first pressing plate 6, crushing teeth 7, water delivery device 8, first one-way valve 9, hose 10, swinging device 11. Nozzle 12, first mounting plate 13, first spring 14, top block 15, first sliding rail 16, first sliding block 17, crushing frame 18 and knocking device 19, left frame is welded on the left side of the bottom plate 1 2. The top plate 3 is welded on the top of the left frame 2, the lifting device 4 is arranged in the middle of the bottom of the top plate 3, the lifting device 4 is connected to the lifting rod 5 at the bottom, the bottom end of the lifting rod 5 is welded with the first pressure plate 6, and the bottom of the first pressure plate 6 is uniform Broken teeth 7 are welded, a water delivery device 8 is installed on the right side of the bottom of the top plate 3, a hose 10 ...
Embodiment 2
[0038] A large stone crushing equipment for road construction, such as Figure 1-6 As shown, it includes bottom plate 1, left frame 2, top plate 3, lifting device 4, lifting rod 5, first pressing plate 6, crushing teeth 7, water delivery device 8, first one-way valve 9, hose 10, swinging device 11. Nozzle 12, first mounting plate 13, first spring 14, top block 15, first sliding rail 16, first sliding block 17, crushing frame 18 and knocking device 19, left frame is welded on the left side of the bottom plate 1 2. The top plate 3 is welded on the top of the left frame 2, the lifting device 4 is arranged in the middle of the bottom of the top plate 3, the lifting device 4 is connected to the lifting rod 5 at the bottom, the bottom end of the lifting rod 5 is welded with the first pressure plate 6, and the bottom of the first pressure plate 6 is uniform Broken teeth 7 are welded, a water delivery device 8 is installed on the right side of the bottom of the top plate 3, a hose 10 ...
Embodiment 3
[0041] A large stone crushing equipment for road construction, such as Figure 1-6 As shown, it includes bottom plate 1, left frame 2, top plate 3, lifting device 4, lifting rod 5, first pressing plate 6, crushing teeth 7, water delivery device 8, first one-way valve 9, hose 10, swinging device 11. Nozzle 12, first mounting plate 13, first spring 14, top block 15, first sliding rail 16, first sliding block 17, crushing frame 18 and knocking device 19, left frame is welded on the left side of the bottom plate 1 2. The top plate 3 is welded on the top of the left frame 2, the lifting device 4 is arranged in the middle of the bottom of the top plate 3, the lifting device 4 is connected to the lifting rod 5 at the bottom, the bottom end of the lifting rod 5 is welded with the first pressure plate 6, and the bottom of the first pressure plate 6 is uniform Broken teeth 7 are welded, a water delivery device 8 is installed on the right side of the bottom of the top plate 3, a hose 10 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com