Construction method and device for precise positioning and fixing of tunnel arch frame

A technology of precise positioning and construction methods, applied in tunnels, measuring devices, tunnel linings, etc., can solve problems such as the overall bearing capacity of the arch frame failing to meet the design requirements, the economy of casualties, and the instability of the face of the tunnel, so as to avoid major Casualties and economic losses, avoiding the instability of the face, and solving the effects of inaccurate positioning

Active Publication Date: 2018-08-03
中国建设基础设施有限公司 +3
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the commonly used tunnel support forms include section steel support, anchor shotcrete support, and masonry support, etc., but under the traditional construction technology, the section steel support commonly used in tunnel engineering has inaccurate positioning and different spacing. and other problems, the above problems make the arch prone to instability and overturning and the risk of uneven stress under the load of surrounding rock, which leads to the overall bearing capacity of the arch not meeting the design requirements, and the deformation of the surrounding rock cannot be well controlled. In severe cases, it may even cause a series of major disasters such as face instability and tunnel collapse, causing heavy casualties and economic losses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method and device for precise positioning and fixing of tunnel arch frame
  • Construction method and device for precise positioning and fixing of tunnel arch frame
  • Construction method and device for precise positioning and fixing of tunnel arch frame

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are some but not all embodiments of the present invention. For ease of description, only parts related to the invention are shown in the drawings.

[0028] It should be noted that, where there is no conflict, the components of the embodiments of the invention generally described and illustrated in the drawings may be arranged and designed in various different configurations. It should be understood that the specific embodiments described here are only used to explain related inventions, rather than to limit the invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method and device for tunnel arching accurate positioning and fixing. The method comprises the following steps that the center line of a tunnel is measured, and according to the position of the center line, an arching operation trolley and a laser distance measuring instrument are distributed; through the laser distance measuring instrument, the preset arching position and surrounding rock key points are determined, and the surrounding rock key points comprise the set positions located at the arch foot and the arch top, and drill holes are stricken in the key points; an arching is mounted to the arching position, steel plates with via holes are arranged on the arching, and the via holes correspond to the drill holes; and an anchorage material is mounted in the drill holes, and threaded steel bars are inserted into the drill holes through the via holes to enable the anchorage material to anchor the threaded steel bars.

Description

technical field [0001] The present disclosure generally relates to the field of tunnel engineering support, and in particular relates to a construction method and device for precise positioning and fixing of a tunnel arch. Background technique [0002] With the continuous development of tunnel engineering construction in my country, the span and length of tunnels are getting larger and larger. During the construction process, a series of complex conditions such as high ground stress, soft rock, fault fracture zone, bias pressure, and water spray are often encountered. The quality and progress of the tunnel construction process put forward higher requirements. At present, the commonly used tunnel support forms include section steel support, anchor shotcrete support, and masonry support, etc., but under the traditional construction technology, the section steel support commonly used in tunnel engineering has inaccurate positioning and different spacing. and other problems, the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/18G01S17/08
CPCE21D11/18G01S17/08
Inventor 王春河董文祥李术才牛晋平于科张爱军李晓亮李延佩樊祥喜张传奎亓祥成石常生胡士旗霍文涛王琦曾艳君鹿伟董文鲁孙会彬陈红宾曾昭楠栾英成张超张皓杰许硕
Owner 中国建设基础设施有限公司