0-1 integer programming-based oil field project group optimal deployment method
A technology of integer programming and group optimization, applied in data processing applications, instruments, predictions, etc., can solve problems that are not strictly optimized decision-making methods, without mathematical calculations, etc., to achieve the effect of improving scientificity and rationality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] In order to make the above and other objects, features and advantages of the present invention more comprehensible, the preferred embodiments are listed below and shown in the accompanying drawings in detail as follows.
[0028] Such as figure 1 as shown, figure 1 It is a flow chart of the method for optimizing the deployment of oilfield project groups based on 0-1 integer programming of the present invention.
[0029] Step 101, determine the optimization model decision variables. According to the 0-1 integer programming model, for each capacity construction project, 0-1 variables are used to quantitatively describe the choice and rejection of the project. At the same time, use the subscript of the variable to reflect the specific time of taking and giving up.
[0030] Step 103, determining the objective function of the optimization model. Calculate the net present value and the time of project arrangement according to the plan of the specific production capacity co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com