Power equipment manufacturing enterprise information progress monitoring method and system

A technology of enterprise information and power equipment, which is applied in the field of information progress monitoring method and system of power equipment production enterprises, can solve problems such as hindering the development of the company, communication and exchange, and untimely contact with outsourcing units, so as to facilitate timely supervision and control of orders progress, ensure confidentiality and security, and realize the effect of real-time comprehensive monitoring

Active Publication Date: 2017-12-22
HANGZHOU ELECTRIC EQUIP MFG +2
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, because many enterprises take into account the confidentiality of internal information, they still use the integrated management system based on the ERP system alone, so that the management level stays at the local area network level, and cannot exchange information with the external network, resulting in frequent network query functions. Problems such as time delay, untimely contact with external cooperation units, and unclear progress and working conditions of each link of production have restricted the company's production scheduling and coordination, and hindered the company's development

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power equipment manufacturing enterprise information progress monitoring method and system
  • Power equipment manufacturing enterprise information progress monitoring method and system
  • Power equipment manufacturing enterprise information progress monitoring method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The core of the present invention is to provide a method and system for monitoring the information progress of electric equipment manufacturing enterprises, so as to realize the monitoring of the production progress of ordered products.

[0030] In order to enable those skilled in the art to better understand the solutions of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] refer to figure 1 , figure 1 It is a flow chart of a method for monitoring the informatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a power equipment manufacturing enterprise information progress monitoring method and system. The method comprises the following steps of: filtering sales order information of a sales department to generate a sales order two-dimensional code, and scanning and recording the sales order two-dimensional code into a cloud database; filtering product structure list information to generate a product structure list two-dimensional code, and scanning and recording the product structure list two-dimensional code into the cloud database; filtering workshop material requisition information to generate a workshop material requisition two-dimensional code, and scanning and recording the workshop material requisition two-dimensional code into the cloud database; filtering inspection application sheet information to generate an inspection application sheet two-dimensional code, and scanning and recording the inspection application sheet two-dimensional code into the cloud database; and filtering warehouse application sheet information to generate a warehouse application sheet two-dimensional code, and scanning and recording the warehouse application sheet two-dimensional code into the cloud database. According to the method, the monitoring for order product production progresses is realized.

Description

technical field [0001] The invention relates to the technical field of monitoring, in particular to a method and system for monitoring the information progress of a power equipment manufacturing enterprise. Background technique [0002] At present, the importance of information in modern society is becoming more and more prominent. In the daily operation of the unit, the managers need to keep abreast of the daily affairs of each department, especially the major mistakes, and track the progress on the basis of ensuring the security of the internal information of the company, so as to accurately ensure quality. Get all the work done without someone or something getting in the way of your entire operation. At present, because many enterprises take into account the confidentiality of internal information, they still use the integrated management system based on the ERP system alone, so that the management level stays at the local area network level, and cannot exchange informati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q30/06G06Q50/06
CPCG06Q10/103G06Q30/0633G06Q50/06
Inventor 张旭峰汪伟斌华靓金明张萍
Owner HANGZHOU ELECTRIC EQUIP MFG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products