Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Determining method and device for radio block center (RBC) control train number calculation parameter

A technology for calculating parameters and quantities, used in transportation and packaging, railway car body components, and control systems of transportation centers, etc., can solve problems such as inconvenience, the value is not clearly specified, and the determination is not very accurate, and achieves the improvement of economic benefits, The effect of saving engineering investment and accurate calculation results

Active Publication Date: 2017-12-29
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, in response to the above problems, relevant technical personnel put forward a local optimization scheme in practical engineering applications. The second paragraph of the "Railway Signal Design Code" (TB 10007-2017) issued by the National Railway Administration in 2017 has a specific requirement for RBC control vehicles. The quantity calculation formula has been optimized systematically, and the optimized formula is used for calculation, but the optimized formula only stipulates the simultaneous utilization coefficient "k" of the track that can store CTCS-3 EMUs within the control range of this RBC "The value is not greater than 1, but there is no clear regulation on how to take the value of "k" in actual engineering applications, which is not convenient for guiding actual engineering applications and is not very practical
[0006] In addition, the number of switching places with adjacent RBCs within the RBC control range in the optimized formula "T RBC-RBC The determination of "is not very accurate. This is because at present, my country's high-speed railway generally adopts the transportation organization mode of automatic block tracking in the forward direction and automatic inter-station block operation in the reverse direction. When the EMU crosses the RBC-RBC boundary, it actually needs to increase The number of vehicles controlled by the RBC is not equal to the number of switching places with adjacent RBCs within the control range of the RBC. The optimized RBC calculation formula may cause a large deviation between the calculation results and the actual application requirements.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Determining method and device for radio block center (RBC) control train number calculation parameter
  • Determining method and device for radio block center (RBC) control train number calculation parameter
  • Determining method and device for radio block center (RBC) control train number calculation parameter

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0081] Embodiment 1 of the present invention provides a method for determining parameters for calculating the number of controlled vehicles, the flow of which is as follows figure 1 shown, including the following steps:

[0082] Step S101: Counting the maximum simultaneous use of transmission lines at the same time within the jurisdiction of the Radio Blocking Center (RBC).

[0083] One or several of the following parameters of each station are counted: station nature, maximum number of simultaneous parking of arrival and departure lines, total number of arrival and departure lines, maximum simultaneous utilization rate of arrival and departure lines, time period of maximum simultaneous use of arrival and departure lines, The nature of the train operation and the ownership of the RBC when the maximum simultaneous use of the arrival and departure lines; determine the maximum simultaneous use of the arrival and departure lines within the jurisdiction of each RBC at the same time...

Embodiment 2

[0112] Embodiment 2 of the present invention provides a specific implementation process of the above-mentioned method for determining the parameters for calculating the number of controlled vehicles.

[0113] 1. The value determination method of coefficient (k) can be used while storing the track of CTCS-3 EMU within the control range of this RBC.

[0114] (1) Overview of station arrival and departure lines (share lanes)

[0115] The number of arrival and departure lines at the station is determined according to the number of passenger trains handled by the station, the passenger flow and the nature of transportation. At the same time, it is also required to meet the needs of dense arrival and departure of trains during peak hours. Combined with the travel situation of our country's passengers, the peak period of the railway should be during the Spring Festival travel season.

[0116] The station-to-departure line stay arrangement, that is, the track operation map is drawn by...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a determining method and device for a radio block center (RBC) control train number calculation parameter. The determining method comprises the steps that statistics on the maximum simultaneous use condition within the jurisdiction range of an RBC from a station to a departure line at the same moment is conducted; according to the character of the station, the operation organization characteristic and the passed car ratio of the station, by referring to the maximum simultaneous use condition, obtained through statistics, from the station to the departure line, fitting analysis is conducted on the maximum simultaneous use ratio from the station to the departure line through normal distribution, and the value of the utilization factor k is determined while a station track of a CTCS-3 level motor train set can be stored within the control range of the RBC used for calculating the control train number; and / or according to train operation direction information and a track blocking system, the number T<RBC-RBC> of the switching position within the control range of the RBC and the control range of an adjacent RBC is determined. The RBC control train number calculation parameter can be better determined, and the accuracy and effectiveness of control train number calculation are improved.

Description

technical field [0001] The invention relates to the technical field of high-speed railway train control, in particular to a method and device for determining parameters for calculating the number of trains controlled by a Radio Blocking Center (RBC). Background technique [0002] When equipped with high-speed railways and passenger dedicated lines of China Train Operation Control System Level 3 (CTCS-3 train control system), the calculation of the number of controlled vehicles is an essential link. [0003] The Radio Blocking Center (RBC) is the core equipment of the CTCS-3 train control system and is a signal control system based on fail-safe computers. RBC generates train traffic authorization (MA) control information according to the ground subsystem or information from external ground systems, such as track occupancy information, interlocking route status, temporary speed limit information, disaster protection and line parameters, and transmits it via GSM-R wireless The...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B61L27/00
CPCB61L27/00B61L27/10
Inventor 池春玲谢静高石先明习博张敏慧郭勇
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products