[0014] The tools and materials used in the construction method of the present invention's core column type towering mast mainly include: 5 to 6 chain hoists of 3 to 5 tons; several sections of steel wire ropes; several sections of steel pipe (or logs) rolling bars; The first grade steel simmers into the hook. Electric welding machine and grinding wheel grinding machine for installation.
[0015] When installing:
[0016] Divided into 4.5~6 meters long core column (round steel or square steel) tied with steel wire rope (or directly welded diameter) 18 grade steel simmered hooks), transported horizontally from the edge of the building. In order to reduce friction and protect the primer, a recyclable steel pipe (or log) roller can be placed under the component;
[0017] After the first core column is transported to the base (steel structure or concrete), use the second and third chain cranes to hang the hooks on both sides of the core column respectively, slowly erect it, and ...