Piling technology for building workshop
A process and plant technology, applied in construction, infrastructure engineering, sheet pile walls, etc., can solve problems such as high cost and poor pre-embedded foundation, and achieve the effect of concise steps, high quality of piles, and stable quality of piles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0020] A kind of piling technology based on building workshop, comprises the steps:
[0021] S1. Determine the position of the pile, carry out construction stakeout through the total station or theodolite, and determine the position of the pile. The stakeout principle of theodolite is to first determine the angle of the stakeout point, and then use a steel ruler or a tape measure to pull the design distance;
[0022] S2. For the production, lifting, transportation and stacking of prefabricated piles, it should be ensured that the prefabricated piles are stacked stably and the distance from the pile driving position is moderate;
[0023] S3. Clean up the ground at the pile site. Site investigation should be done before construction. If there are overhead wires, underground wires, water supply and drainage pipes and other facilities, which hinder the construction or affect the safe operation, they should be cleared, moved or removed first. Work can only start after proper handli...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com