Building component sealing component and structure
A technology of building components and sealing components, which is applied in the direction of building construction and construction, can solve the problems of friction between seals and components, and achieve the effect of reducing mutual friction and prolonging the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like Figure 1 to Figure 3 As shown, the sealing structure of the building components of Embodiment 1 includes two adjacent building components 10 and two adjacent sealing strips 20 arranged between the two adjacent building components and used as sealing components; Each sealing strip 20 is a hollow tubular elongated structure, and each sealing strip has a connection surface combined with the connection side of the adjacent building component 10, and a snap-fit structure is provided between the connection surface and the connection side, two The close contact between the sealing strips 20 forms a joint surface, and the inner side wall and the outer side wall of the pipe wall 22 between the joint surface and the connecting surface of the sealing strip 20 form a V-shaped fold line shape. The inner side wall and the outer side wall of the close contact between the two sealing strips 20 form a concave cross-sectional shape in the shape of a V-shaped fold line. symmetric...
Embodiment 2
[0044] Figure 4 The structure of the second embodiment of the sealing structure of the building element of the present invention is shown. The difference between the sealing structure of the building element of the second embodiment and the first embodiment is that the shape of the fixing clip is different. In the second embodiment, the fixing clip 21 and the card slot are both L-shaped.
Embodiment 3
[0046] Figure 5 The structure of the third embodiment of the sealing structure of the building components of the present invention is shown. The difference between the sealing structure of the building components of the third embodiment and the second embodiment is that the shapes of the embedded metal components of the building components are different. In the second embodiment , A pre-embedded metal component is formed on the connection side, and the end of the pre-embedded metal component is provided with an inwardly bent bending section. In the third embodiment, the end of the pre-embedded metal component has no inwardly bent bending section.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com