Dam engineering material field digital modeling optimization method

An optimization method and stockyard technology, applied in electrical digital data processing, design optimization/simulation, data processing applications, etc., can solve problems such as long construction period, inaccurate results, and high cost

Active Publication Date: 2018-04-13
CHENGDU XIMENG TEKE TECH DEV CO LTD
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Standardized and systematic digital dam stockyard modeling parameter acquisition technology has not yet been formed. In addition, due to the irregular shape of the gravel soil core rockfill dam project, many processes, complex construction conditions and long construction period, the existing The technology cannot digital

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dam engineering material field digital modeling optimization method
  • Dam engineering material field digital modeling optimization method
  • Dam engineering material field digital modeling optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0222] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.

[0223] In describing the present invention, it should be understood that the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship indicated by "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than Nothing indicating or implying that a referenced device or elem...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a dam engineering material field digital modeling optimization method which comprises the following steps: S1, data partitioning is carried out on the material field raw materials selected during construction of a dam body; S2, acquiring parameter data of the data-partitioned material field raw materials, and carrying out material field modeling on the obtained parameter data; S3, performing mining stone sequence constraint on the modeled material field model, so that an engineering construction model of the material field raw materials filling the dam body is quickly generated. According to the embodiment, the big data of the construction resources configured for the material field is calculated to obtain the engineering construction progress, the acquired collection data of the gravel soil core wall filling material field is standard and accurate, the manual working procedures are reduced, and the construction conditions are visual and concise.

Description

technical field [0001] The invention relates to the field of computer-aided design, in particular to a digital modeling optimization method for a dam engineering material yard. Background technique [0002] At present, the method of resource allocation and schedule coordination of gravel soil core rockfill dam projects is usually based on empirical analysis, and then manually fuzzy calculation of the construction schedule according to the allocated construction resources. Standardized and systematic digital dam stockyard modeling parameter acquisition technology has not yet been formed. In addition, due to the irregular shape of the gravel soil core rockfill dam project, many processes, complex construction conditions and long construction period, the existing The technology cannot digitally convert the data collected by the dam stockyard, so it cannot form a scientific and reasonable collection plan. From the perspective of the technologies disclosed in this field, the mode...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50G06Q10/04G06Q50/08
CPCG06Q10/04G06Q50/08G06F30/20
Inventor 杨兴国刘飞虎李洪涛姚强陈思迪李炬坷辜斌
Owner CHENGDU XIMENG TEKE TECH DEV CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products