Rapid network access installation and debugging system for intelligent terminal equipment and working method
An intelligent terminal equipment, installation and debugging technology, applied in transmission systems, home automation networks, data exchange through path configuration, etc., can solve problems such as trouble finding equipment, and achieve the effect of solving time-consuming and repetitive manual operations.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] This embodiment provides a fast network installation and debugging system for intelligent terminal equipment, such as figure 1 As shown, it includes intelligent terminal equipment, APP enterprise client, APP user terminal, intelligent gateway and cloud platform server, the intelligent terminal equipment is associated with the intelligent gateway, the intelligent gateway is connected with the cloud platform server, and the APP enterprise The client is connected to the cloud platform server;
[0034] The APP enterprise client is installed on a mobile terminal with an information entry function, and the APP enterprise client is used for centralized collection and entry of smart device ID numbers;
[0035] The APP client is used to operate the installed smart terminal device to check the status of the device and receive dynamic messages;
[0036] The cloud platform server is used to store the data information reported by the intelligent terminal equipment, the intelligent ...
Embodiment 2
[0050] The difference between embodiment 2 and embodiment 1 is:
[0051] Such as Figure 3-4 As shown, the present invention also provides a working method of a fast network access installation and debugging system for intelligent terminal equipment, including the following steps:
[0052] (1) Preparation before installation, using a room of a unit as a template, through the operation of the APP enterprise client, name the parent and child folders of the smart installation scheme one by one, and add virtual control devices; set up each virtual after adding The binding relationship between the control devices and the data information of the trigger conditions are associated and reported to the cloud platform server for storage.
[0053] (2) At the installation site, organize the material installation list according to the unit, distribute the location of the intelligent terminal equipment product according to the distribution of the electrician's installation drawing, and instal...
Embodiment 3
[0058] The present invention also provides a working method for the quick network access installation and debugging system of intelligent terminal equipment, which includes the following steps: (1) The installer first divides the different apartment types and intelligent installation schemes in the project into multiple units, such as three rooms Sets are classified into sets, two-room sets, and one-room sets, and the number of contained units is counted.
[0059] (2) Then arrange a unit in the project, such as kitchen, dining room, and bathroom, determine the category and quantity of product distribution points, and calculate the specifications and quantities of smart products required.
[0060] (3) Place the smart products one by one at the nearest location where all the rooms of a unit are ready to be installed.
[0061] In layman's terms, there is a residential building with 4 households on each floor and a total of 30 floors. The smart installation design schemes on both...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com