Design change, engineering negotiation or on-site signature check task interaction method and device
A technology of design changes and interactive methods, applied in computing, instrumentation, data processing applications, etc., to achieve the effect of rigorous process, timely and accurate signing and approval
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] This embodiment provides a design change, engineering negotiation and / or on-site visa task interaction method. According to the specific characteristics of the project, when the project starts, the first-level user (such as: vice president) of the construction unit will change the negotiation visa module. The team members select and set the post personnel for each process step (to realize the automatic flow of process steps), and include the following steps:
[0033] S10. In the group management of the project, the team manager of the construction unit sets the corresponding personnel for the positions automatically transferred by each participating construction unit in the process.
[0034] S20. The party participating in the construction creates a design change, project negotiation or on-site visa task, and (the system) automatically transfers it to the manager of the initiator preset in the group management to review the first draft. In this embodiment, the party par...
Embodiment 2
[0051] This embodiment provides an interactive device (system) for design changes, engineering consultations, and on-site visa tasks, which includes:
[0052] The task creation module is used to create design change, project negotiation or on-site visa tasks. In this embodiment, the personnel of the construction unit create design change, project negotiation or on-site visa tasks, and (the system) automatically transfer them to the preset construction unit in the team management The chief engineer of the project reviews and approves the task; after the design change or project negotiation or on-site visa task is created, the project chief engineer of the construction unit can review and approve the task through the task creation module. If the task is not approved after the project chief engineer of the construction unit reviews it , then the design change, engineering negotiation, and on-site visa task interaction will end.
[0053] The task generation module forms assignable...
Embodiment 3
[0061] image 3 It is a schematic structural diagram showing a device according to Embodiment 2 of the present application, and the specific embodiment of the present application does not limit the specific implementation of the device 400 . Such as image 3 As shown, the device 400 may include:
[0062] A processor (processor) 410 , a communication interface (Communications Interface) 420 , a memory (memory) 430 , and a communication bus 440 . in:
[0063] The processor 410 , the communication interface 420 , and the memory 430 communicate with each other through the communication bus 440 .
[0064] The communication interface 420 is used for communicating with network elements such as clients.
[0065] The processor 410 is configured to execute the program 432, and may specifically execute relevant steps in the foregoing method embodiments.
[0066] Specifically, the program 432 may include program codes including computer operation instructions.
[0067] The processor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com