Project development workload estimation method based on dual-objective feature selection and optimization
A feature screening and workload technology, applied in the field of project development workload estimation based on dual-objective feature screening optimization, can solve problems such as unstable demand, high project cost, difficult project planning, monitoring and control, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The overall flow chart of the project development workload estimation method based on dual-objective feature screening optimization in this embodiment is as follows figure 1 Shown, it is characterized in that comprising the following steps:
[0040] (1) Collect data on enterprise history items.
[0041] Analyze the historical projects developed by the team, and measure different historical projects with the help of metrics that are correlated with project development workload (from the perspective of data mining, metrics can be regarded as characteristics). Commonly used metrics include team experience, project supervisor experience, number of logical transactions included in the project, function points, development environment, etc. The specific meanings are shown in Table 1.
[0042] Table 1 The names and meanings of commonly used metrics
[0043]
[0044] By collecting the historical development projects of a software company, the final data set is as follows: ...