Gathering and transportation pipe bundles, fouling cores, gathering and transportation agglomeration and descaling devices and systems
A core tube, gathering and transportation technology, which is applied in the direction of drill pipe, casing, wellbore/well parts, etc., can solve the problem that the scaling in the pipeline cannot be fundamentally eliminated, so as to improve the efficiency of accumulation and descaling and simplify the maintenance work , The effect of reducing the scaling tendency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0084] Take the low-pressure water supply pipeline with an inner diameter of 200mm, an outer diameter of 205mm, and a rated pressure of 2.5MPa to implement agglomeration and scale removal process as an example. The system uses oilfield purified sewage as the water injection source.
[0085] Step 1: Analyze and test the water quality of the injected water, and its salinity is 43912.85mg / L, the alkalinity is relatively large, it is sodium bicarbonate water type; the SI (saturation index) index is 2.31, and there is a strong tendency to scale; Scaling ion Ca 2+ The concentration is 104.56mg / L, and the Mg2+ concentration is 82.41mg / L. The laboratory analyzes the fouling tendency at different flow rates. When the flow rate is less than 2m / s, the fouling trend becomes obviously larger, and the smaller the flow rate, the more obvious the trend .
[0086] Step 2: Use a three-stage collection tube bundle for the gathering and transportation tube bundle. The inner and outer diameters of the ...
Embodiment 2
[0092] Take the low-pressure water supply pipeline with an inner diameter of 200mm, an outer diameter of 205mm, and a rated pressure of 2.5MPa to implement agglomeration and scale removal process as an example. The system uses oilfield purified sewage as the water injection source.
[0093] Step 1: Analyze and test the water quality of the injected water, and its salinity is 43912.85mg / L, the alkalinity is relatively large, it is sodium bicarbonate water type; the SI (saturation index) index is 2.31, and there is a strong tendency to scale; Scaling ion Ca 2+ The concentration is 104.56mg / L, Mg 2+ The concentration is 82.41mg / L. The laboratory analyzes the fouling trend under different flow rates. The fouling trend becomes obvious when the flow rate is less than 2m / s, and the smaller the flow rate, the more obvious the trend.
[0094] Step 2: Use a four-stage collection tube bundle for the gathering and transportation bundles, the shunt pipe 10, the diversion pipe 20, the bottom bran...
Embodiment 3
[0100] Take the low-pressure inlet pipeline of the crude oil processing system with an inner diameter of 150mm, an outer diameter of 155mm, and a rated pressure of 2.5MPa to implement the process of agglomeration and scale removal as an example, and the incoming liquid contains 80% water.
[0101] Step 1: Analyze and test the quality of the free water in the incoming liquid. The salinity is between 10000 and 20000 mg / L, and the Ph value is weakly alkaline. There is a strong tendency to fouling, and the final standing rate of calcium loss is 80%; the laboratory analyzes the fouling trend at different flow rates, and the fouling trend becomes significantly larger when the flow rate is less than 2m / s, and the flow rate decreases. The more obvious.
[0102] Step 2: The four-stage gathering pipe bundle is selected as the gathering pipe bundle, and two sets of parallel processes are used. The inner and outer diameters of the shunt pipe 10, the draft pipe 20 and the bottom branch pipe 30,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


