Underground station underground-and-then-open excavation construction method

A technology for underground stations and construction methods, applied in underground chambers, artificial islands, earth-moving drilling, etc., can solve the problems of low construction efficiency, small application scope, occupying urban ground space, etc., so as to improve construction efficiency and shorten construction period. , the effect of reducing the time occupied by the urban ground

Active Publication Date: 2018-06-29
CRRC CONSTR ENG CO LTD
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since full open excavation takes a long time and occupies a large area of ​​urban ground space, the scope of application is very small, so full open excavation construction is mostly used; compared with full open excavation construction, the construction efficiency is significantly lower
[0003] However, no matter which excavation method is used, it can only be opened to traffic after the excavation of the station is completed.
At the same time, since underground stations are often close to surrounding buildings and structures, and sometimes even directly below them, various measures need to be taken during construction to reduce the impact on the surrounding environment, which will also lead to slow construction progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground station underground-and-then-open excavation construction method
  • Underground station underground-and-then-open excavation construction method
  • Underground station underground-and-then-open excavation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] In the following, the present invention will be further explained through the embodiments and the accompanying drawings:

[0027] To complete figure 1 , figure 2 As shown in the construction of underground station A, and realize the early opening of track line B before the completion of underground station construction, an underground station excavation construction method in which the underground station is first dark and then exposed, includes the following steps:

[0028] The first step, such as Figure 4a As shown, the lower left pilot hole C and the lower right pilot hole D (referred to as "left and right pilot holes") of the cross section of the underground excavated station. The left and right pilot tunnels are excavated by upper and lower steps respectively, and can also be excavated by full-section method, three-step method, CD method, etc. depending on the situation; excavation methods such as shock-absorbing blasting or mechanical section can be used for excavatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an underground station underground-and-then-open excavation construction method. The underground station underground-and-then-open excavation construction method comprises thesteps that 1, lower left corner guiding holes and lower right corner guiding holes of the cross section of a station are subjected to underground excavation; 2, primary supports, secondary linings, end bottom plates, side walls, end floor slabs, frame columns and end platform plates are constructed in the lower left corner guiding holes and the lower right corner guiding holes, and then track laying, power supplying and communicating are completed; 3, unprotected open cut excavation is conducted above the station till the positions of the end floor slabs of the station are reached, and centralrock soil between the lower left corner guiding holes and the lower right corner guiding holes is excavated; 4, central bottom plates, central floor slabs, central platform plates and a vault of thecross section of the station are constructed; and 5, backfilling is conducted above the station. The station meets the open traffic condition in advance, and advanced open traffic is achieved before underground excavation construction of the underground station of a track line is completed; and the whole construction period of the underground station is shortened, the construction efficiency is improved, the time of city ground occupying is reduced, and the advantages of full open excavation and full underground excavation are both taken into consideration.

Description

Technical field [0001] The invention relates to the technical field of tunnel construction, in particular to an excavation and construction method of an underground station in which the underground station is dark first and then exposed. Background technique [0002] figure 1 , figure 2 Shown is the layout of underground station A and track line B. Existing underground stations are either fully excavated or fully excavated. Since the full open excavation takes a long time and takes up a large area of ​​urban ground space, and the scope of application is very small, full subsurface excavation construction is often used; and full subsurface excavation construction has significantly lower construction efficiency than full open excavation construction. [0003] However, no matter what kind of excavation method, it needs to be opened to traffic after the excavation of the station is completed. At the same time, because underground stations are often close to surrounding structures, a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D13/02E21D11/00E02D29/045
CPCE02D29/045E21D11/00E21D13/00
Inventor 王猛李勇聂鑫路张宇川殷立达许满吉王成
Owner CRRC CONSTR ENG CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More