Method for determining uncertainty and risk degree of small riverway pollutant degradation coefficient
A technology with uncertainty and degree of risk, applied in data processing applications, instruments, general water supply conservation, etc., can solve problems such as difficulties in accurate management of river water quality, and achieve the effect of easy promotion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] A method for determining the uncertainty of the degradation coefficient of small-scale river pollutants and its risk level, comprising the following steps:
[0056] (1) To measure the concentration C of selected pollutants at the initial section of the upper reaches of the river where the uncertainty of the pollutant degradation coefficient and the degree of risk need to be determined 0 , the average flow velocity u of the river;
[0057] (2) Repeatedly measure the selected pollutant concentration C(x) at x meters from the initial cross section n times. In order to ensure the calculation accuracy, n must be greater than 10, x must be greater than 1500, and there is no pollution source and sink between the upstream and downstream of the river section Input, to obtain the measured mathematical expectation E(C) and variance D(C) of the selected pollutant concentration C(x) at x meters from the initial section; specifically, the following steps are included:
[0058] a. Sele...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


