Dock wearing layer and road storage yard large board prefabricating and mounting technique
A technology of prefabricated installation and wear layer, applied in the direction of roads, roads, road repair, etc., can solve the problems affecting the quality of concrete components, plastic crack temperature, long time, etc., and achieve the effect of diversified maintenance methods, low cost and good control.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0034] Such as figure 1 and figure 2 as shown,
[0035] A process for prefabricating and installing large slabs in wharf wearing layers and road storage yards, the specific steps are as follows:
[0036] a. Factory slab prefabrication
[0037] According to the design size, the concrete undercarriage 1 is prefabricated in the factory in advance. The concrete undercarriage 1 is surrounded by shaped steel formwork, and bolt holes are set at the four corners. Bolts 2 are pre-embedded in the bolt holes as lifting points, and finally the prefabricated concrete components are obtained. 3;
[0038] b. Factory unified standard maintenance
[0039] The prefabricated concrete components 3 are uniformly maintained;
[0040] c. to install
[0041] During installation, a grouting layer 4 of 1-2 cm is reserved at the bottom, and an inverted T-shaped positioning stee...