A foundation treatment, progressive technology, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as increased energy consumption, decreased soil water content, increased energy consumption of drainage, etc., to improve efficiency and reduce costs , the effect of reducing energy consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Embodiment 1: A kind of ground treatment method of gradual electrification, such as figure 1 As shown, the direction of the arrow indicates the direction of progressive energization, including the following steps: preparation work, arrangement of conductive plastic drainage board, arrangement of drainage pipe 5, and progressive energization and electroosmotic treatment.
[0045] Preparatory work: Lay the cushion layer 2 on the surface of the soft soil foundation 1 that needs to be reinforced, divide the soft soil foundation 1 that needs to be reinforced into multiple construction areas, and construct on multiple construction areas at the same time to improve work efficiency. One end of the construction area is set as the starting working point, and the other end is set as the ending working point; the cushion layer 2 is a sand cushion layer, and the setting method in each construction area is the same.
[0046] Arrangement of conductive plastic drainage boards: There ar...
Embodiment 2
[0053] Embodiment 2: a kind of ground treatment method of progressive electrification, such as image 3 As shown, the direction of the arrow indicates the direction of progressive energization. The difference from Embodiment 1 is that three adjacent conductive drains are set as a working unit. The first conductive drain part 3, the second conductive drain part 4, and the third conductive drain part are set as the first working unit 6; the second conductive drain part 4, the third conductive drain part, and the fourth conductive drain part are set as the second working unit Unit 7; ...; the 98th conductive drainage unit, the 99th conductive drainage unit, and the 100th conductive drainage unit are set as the 98th working unit.
[0054] Such as Figure 4 As shown, the direction of the arrow indicates the direction of progressive energization. During the energization process, firstly energize the first working unit 6, connect the first conductive drainage part 3 to the positive ...
Embodiment 3
[0055] Embodiment 3: a kind of ground treatment method of progressive electrification, such as Figure 5 As shown, the direction of the arrow indicates the direction of progressive energization. The difference from Embodiment 1 is that there is one starting working point and two ending working points. The starting working point is located in the middle of the construction area, and the ending working point is located in The two ends of the construction area are progressively energized from the middle of the construction area to the two ends of the construction area.