Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A kind of construction equipment and intelligent technology, applied in the field of electric power, can solve the problems of high labor intensity, long time consumption, slow efficiency, etc., and achieve the effect of improving work efficiency, reducing labor intensity, and facilitating excavation
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0003] In order to solve the above problems, the present invention provides a kind of electric power intelligent construction equipment, which can solve the cumbersome and complicated process that requires personnel to dig pits, manually dig out the broken soil and manually paint the cable marker piles in the process of installing cable marker piles. When digging a pit, the personnel need to use tools to dig the pit, and it takes a long time for the personnel to dig the pit to meet the requirements of the work. It is easy to cause safety hazards when bending over for a long time to dig the soil. The broken soil on the side is not easy to dig out, manual digging is inconvenient, and the efficiency is slow. When painting, personnel use tools to gradually paint the cable marker piles. The process is slow. It is easy to spray to the position that does not need to be sprayed during work. The working process, the process takes a long time, the labor intensity is high and the efficiency is low. It can realize the functions of automatic digging and shoveling of the soil, spraying and painting on the surface of the cable marker pile, automatic digging, and automatic multi-directional cutting. Flat, quickly complete the work requirements, automatic excavation of broken soil, automatic centralized stacking of broken soil, convenient digging, automatic painting, automatic blocking of positions that do not need to be sprayed, no need for human operation, ensuring personnel safety, short time consumption, and has The advantages of simple operation, low labor intensity and high work efficiency
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0036] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.
[0037] Such as Figure 1 to Figure 10 As shown, in order to achieve the above object, the present invention adopts the following technical solutions: a kind of electric power intelligent construction equipment, including mobile platform 1, digging device 2, shoveling away device 3 and spraying device 4, and digging device 2 carries out soil pit Digging pits and chopping, shoveling device 3 digs away the crushed soil in the pit, spraying device 4 sprays and brushes the surface of the cable marker pile, and the front end of the mobile platform 1 is equipped with digging device 2, movin...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention relates to electric power intelligent construction equipment. The equipment comprises a movable platform, a pit digging device, a shoveling and separating device and a spraying and brushing device, wherein the front end of the movable platform is provided with the pit digging device, the right side of the rear end of the movable platform is provided with the shoveling and separatingdevice, and the left side of the rear end of the movable platform is provided with the spraying and brushing device. According to the equipment, the problems that workers need to dig a pit in an existing cable sign pile mounting process, scattered soil needs to be manually dug and separated and cable sign piles need to be manually painted are solved; the problems that when pit digging is carriedout, the workers need to dig the pit by means of a tool, the workers need to dig the pit for a long time to meet the required requirements of the work, and when pit digging is carried out, the scattered soil needs to be manually shoveled and separated, and the scattered soil at the edge of the pit is not easy to dig and separate are solved; the problems that when painting is carried out, the workers gradually paint the cable sign piles by means of the tool, the working process is affected due to the fact that the position which does not need to be sprayed and painted is sprayed and painted during working are solved; and the function of automatically digging the pit in soil and the function of spraying and painting the surfaces of the cable sign piles can be achieved.
Description
technical field [0001] The invention relates to the field of electric power, in particular to electric power intelligent construction equipment. Background technique [0002] Cable marker stakes are also known as power cable marker stakes, marker stakes, natural gas marker stakes channel vertical marker stakes, commonly used in electric power, communication, gas, tap water, railway geographical pipeline path channel indication signs and warning signs, used in downtown, scenic spots , green belts, bushes, pipeline path indication on both sides of pipe jacking, high strength, the product is made of new unsaturated resin material, pressed at high temperature, impact resistance, wear resistance, high temperature resistance, corrosion resistance, so the service life is long 30 years, the appearance is beautiful, the product can be made into various colors, the font pattern is clear, the warning is obvious and can beautify the urban environment, prevent theft, the synthetic materi...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.