Ground foundation and construction method of cast-in-place and prefabricated combined portable communication tower
A construction method and communication tower technology, which are applied in infrastructure engineering, construction and other directions, can solve the problems of low transportation and loading and unloading costs, long construction period, and short construction period of communication tower landing foundation, and achieve low transportation and loading and unloading costs and installation alignment. The effect of convenience and high connection reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1: A cast-in-place and prefabricated combined portable communication tower foundation (see attached Figures 1 to 6 ), including detachable and reusable shaped frame 1, prefabricated block 2, and cast-in-place concrete 3 arranged on the left and right sides of the prefabricated block. Embedded parts for installing communication towers are poured in the prefabricated block. Both the prefabricated block and the cast-in-place concrete Set in the stereotyped frame, both the prefabricated block and the cast-in-place concrete are laid with steel mesh 17, the left and right sides of the steel mesh on the prefabricated block are exposed to the prefabricated block and connected with the steel mesh in the cast-in-place concrete, and the prefabricated block is embedded with Several horizontal pre-embedded rods 4 and several longitudinal pre-embedded rods 5, the ends of the horizontal pre-embedded rods and the longitudinal pre-embedded rods are all exposed to the prefabri...
Embodiment 2
[0033] Embodiment 2: A cast-in-place and prefabricated combined portable communication tower foundation (see attached Figure 7 , attached Figure 8 ), its structure is similar to that of Embodiment 1, the main difference is that in this embodiment, the lower surface of the prefabricated block is fastened and connected with several laterally arranged wing plates 12, and the wing plates are arranged under the cast-in-place concrete. The corner positions on the lower surface of the prefabricated block are all provided with leveling grooves 13, the opening end of the leveling grooves is provided with a protective film 14, the upper surface of the prefabricated block is provided with a grouting hole 15 connected to the leveling groove, and the upper end of the grouting hole is provided with Grouting joint 16. The diameter of the grouting hole increases gradually from top to bottom. Other structures are the same as in Embodiment 1.
[0034] A construction method for the ground f...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


