Natural pilot tunnel roof ripping method
A natural and positive hole technology, applied in the shaft lining, tunnel lining, underground chamber, etc., can solve the problems of lowering the stability of the support, losing the working platform, and increasing safety risks, so as to reduce artificial over-excavation and support the beam position Smooth, ensure the progress of the effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0035] A method for raising a roof through a natural guide tunnel, comprising the following steps:
[0036] S1. The welded support steel plate of the last arch frame 3 in the horizontal hole is used as the reserved connecting plate, the height of the reserved connecting plate 4 is 10cm, arranged perpendicular to the horizontal line, and the layout spacing is 0.8m;
[0037] S2. Along the direction of the small mileage of the tunnel, one side of the arch frame i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com