A method for determining the construction and excavation parameters of a shield tunnel passing through a waterway
A technology of tunneling parameters and shield tunneling, applied in CAD numerical modeling, special data processing applications, design optimization/simulation, etc., can solve problems such as inaccurate positioning, errors, and reduced accuracy of simulation results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The invention provides a method for determining the parameters of construction and excavation through a water passage under a shield tunnel, comprising the following operation steps;
[0043] Step S1: In the construction section of the entire line, select the test section with the same geological conditions as the target waterway (i.e., a certain section of waterway, including but not limited to the Ma Liuzhou waterway) according to the hydrogeological conditions, and conduct construction site simulation;
[0044] Step S2: When simulating the construction site of the test section, arranging monitoring surfaces and monitoring points, collecting and arranging various construction parameter information in the simulated construction, so as to determine the preliminary proposed tunneling parameter values during the passage of the shield machine through the target waterway;
[0045] Step S3: using spss software and adopting the method of cluster analysis to divide the constr...
Embodiment 2
[0062] The second embodiment of the present invention provides a method for determining the parameters of construction and excavation through the water channel under the shield tunnel (the operation method is the same as that of the first embodiment, which is only an embodiment applied to the Ma Liuzhou water channel);
[0063] In the second embodiment of the present invention, a method for determining the parameters of construction and excavation through the water channel under a shield tunnel is introduced by taking the shield machine crossing the Ma Liuzhou waterway as an example, which includes the following steps (see figure 1 , and more details about the operation process can be found in figure 2 ):
[0064] Step S1: In the construction section of the entire line, according to the hydrogeological conditions, select the test section with the same geological conditions as the target waterway (that is, the Ma Liuzhou waterway), and carry out construction site simulation; ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com