River channel cleaning device arranged on ship and method
A cleaning device and river channel technology, which is applied to the cleaning of open water surfaces, mechanically driven excavators/dredgers, water conservancy projects, etc. It can solve the problems of long construction period of garbage and silt, low removal efficiency, and affecting the normal navigation function of the river channel, etc. , to achieve the effect of maintaining good river water quality, avoiding secondary pollution, convenient and efficient automatic removal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as Figure 4 , Figure 5 The illustrated embodiment is a river cleaning device installed on a ship 101, which is equipped with a power system 12 for driving the ship, including two vertical swing wings 201 respectively arranged on the upper parts of the two sides of the ship, and two vertical swing wings 201 The swinging wings all include a first garbage intercepting grid 202 and a second garbage intercepting grid 203 perpendicular to the side of the ship, and the upper and outer lower parts of the first garbage intercepting grid are respectively provided with 2 first motors 204 and 2 first motors 204. The rotating shaft of a motor is respectively connected with the inner upper part and the inner lower part of the second garbage interception grid, and the ship is provided with two second motors 205 for respectively driving the two first garbage interception grids to turn over, and also includes a controller 15, The controller is electrically connected with the two...
Embodiment 2
[0054] Embodiment 2 includes all structure and method parts of embodiment 1, such as figure 1 , image 3 , Figure 5 As shown, embodiment 2 also includes 5 vertical rods 1 located at the bottom of the ship, the river bottom disturbance device 2 located at the lower end of each vertical rod, the suction pipe 3 located on the bottom of the ship behind each vertical rod, located at the suction The first water pump 8 on the pipe, the first filter box 4 located in the ship, the first storage tank 5 communicated with the first filter box, the first push plate 41 located in the first filter box, and the first push plate The first power unit 42 that the plate is connected is located at the collection pool 43 below the first filter box; the collection pool is connected with the second filter box 6 through a pipeline 103, and the second filter box communicates with the second storage tank 102, and the second filter box The second push plate 61 is arranged in the middle, and the second...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


