IBSG (Integrated Belt-driven Starter/Generator) motor system stand and test method and device
A test method and bench technology, which are applied in the direction of motor generator testing, testing of electrical devices in transportation, measuring devices, etc., can solve problems such as inability to respond to motor characteristics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] figure 1 It is a step-by-step flowchart of a test method for an IBSG starter-generator integrated motor system bench according to Embodiment 1 of the present invention. This embodiment is applicable to simulating a real vehicle for an IBSG starter-generator integrated motor on a system bench Running the motor performance, the method can be figure 2 It is carried out on the basis of a kind of IBSG starter-generator integrated motor system bench shown in the embodiment of the present invention, refer to figure 2 , the system bench 20 may include a dynamometer 21, a power module 22, a host computer 23 and an IBSG motor installation position 24 to be tested. It is connected with the power module 22, and the IBSG motor is connected with the dynamometer 21 (the connection mode between the IBSG motor and the dynamometer 21 includes general connection modes such as flange plate or gear direct connection, belt connection, etc.), so The upper computer 23 communicates with the...
Embodiment 2
[0058] image 3 It is a flow chart of the steps of a test method for an IBSG starter-generator integrated motor system bench in Embodiment 2 of the present invention. This embodiment is a further improvement on Embodiment 1. For the similarities, refer to Embodiment 1. This embodiment is in This will not be repeated, such as image 3 As shown, the test method of the embodiment of the present invention specifically includes the following steps:
[0059] Step 201 , setting a first preset value of the rotational speed of the IBSG motor to be tested, so that the rotational speed of the IBSG motor is the first preset value, and setting a target torque of the IBSG motor.
[0060] Step 202, acquiring the measured torque of the IBSG motor in real time.
[0061] Step 203: Calculate the current calculated torque of the IBSG motor in real time based on a preset algorithm.
[0062] Step 204, if the deviation between the measured torque and the target torque is not within the preset ran...
Embodiment 3
[0104] Figure 5 It is a structural block diagram of a test device for an IBSG generator integrated motor system bench according to Embodiment 3 of the present invention. The test device in the embodiment of the present invention may specifically include:
[0105] The torque setting module 301 is used to set the first preset value of the speed of the IBSG motor to be tested, so that the speed of the IBSG motor is the first preset value, and set the target torque of the IBSG motor;
[0106] Torque acquisition module 302, used to acquire the measured torque of the IBSG motor in real time;
[0107] A torque calculation module 303, configured to calculate the current calculated torque of the IBSG motor in real time based on a preset algorithm;
[0108] The measured torque adjustment module 304, configured to adjust the control parameters of the IBSG motor if the deviation between the measured torque and the target torque is not within a preset range, so that the difference betwee...