A method of building high-grade highways in areas with poor geological conditions
A geological condition, high-level technology, applied in roads, buildings, roads, etc., can solve the problems of poor controllability, high cost, and poor road stability of goaf filling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be further described below in conjunction with embodiment:
[0025] see Figure 1-Figure 2 , a method for building high-grade highways in areas with poor geological conditions, comprising the steps of:
[0026] Drill holes on the ground surface, and determine the position and number of drill holes according to the calculation of the length and bearing capacity of the road surface. The drill holes pass through the surface soil layer 1, bedrock layer 2, goaf 3 and stable rock layer 4 from top to bottom in order of more than 5m distance; place the outer metal casing 5 in the borehole, the bottom of the outer metal casing 5 is placed at a distance of 2m in the stable rock formation, the diameter of the outer metal casing 5 is 450-1400mm, and the pipe wall The thickness is 3-10mm; the inner metal casing 6 is placed in the outer metal casing 5, the bottom of the inner metal casing 6 is placed at the bottom of the borehole and at a distance of 5m in...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


