A field verification system for ground equipment of ctcs-4 train control system
A CTCS-4, train control system technology, applied in the field of rail transit, can solve problems such as no solution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0019] The embodiment of the present invention provides an on-site verification system for CTCS-4 train control system ground equipment, such as figure 2 As shown, it mainly includes: C3 interface monitoring module, C4 interface simulation module and C4 verification module; where:
[0020] The C3 interface monitoring module is connected to the CTCS-3 train control system of the existing line, connected to the internal data network on the ground of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


