Construction engineering process control and management system

A process control and construction engineering technology, applied in data processing applications, electrical digital data processing, special data processing applications, etc., can solve the problems of project cost control and untimely acquisition of project progress, and achieve changes in project information. Improve project cost control and schedule management efficiency and ensure objective results

Inactive Publication Date: 2018-12-07
北京鸿游科技有限公司
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The invention provides a construction engineering process control and project management system to solve the technical problem of untimely acquisition of project cost control and project progress in the management of large-scale construction engineering projects in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction engineering process control and management system
  • Construction engineering process control and management system
  • Construction engineering process control and management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] Such as figure 1 and figure 2 As shown, the construction engineering process control management system of the embodiment of the present invention includes: a terminal device 1, a data cache server 3, and a main server 2 that exchanges information with the terminal device 1 through the network; the terminal device 1 and the data cache server 3 A data cache server 3 and dozens of terminal devices 1 can be set for multiple, such as a large-scale project, and the main server 2 is used to manage multiple large-scale projects.

[0024] The terminal equipment 1 includes a sub-communication device 13, an information collection module 11, a bill output module 12 and an information processing device 10; Generally, the terminal device 1 includes, but is not limited to: a mobile phone, a palmtop computer, a notebook computer, a desktop computer, a digital music player or a walkie-talkie, or a special device designed for this purpose.

[0025] The information collection module 11...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction engineering process control and project management system, and belongs to the technical field of a construction engineering management system. The construction engineering process control and management system comprises terminal equipment, a data caching server and a main server which interacts information with the terminal equipment through the network, wherein the terminal equipment includes a sub-communication device, an information acquisition module, a bill output module and an information processing device; the sub-communication device, the information acquisition module and the bill output module are connected with the information processing device; the main server includes a chart output module, a storage device, a retrieval device, a main communication device and an analysis computer; the chart output module, the storage device, the retrieval device and the main communication device are connected with the analysis computer; and the structure of the data caching server is the same as that of the main server, and the data caching server is in real-time connection with the terminal equipment and is in real-time synchronization with the main server. The construction engineering process control and management system has the technical advantages of high link response speed, visual output chart, convenient information acquisition and highsecurity performance.

Description

technical field [0001] The invention relates to the field of construction engineering equipment, in particular to a construction engineering process control and project management system. Background technique [0002] With the development of electronic information technology, especially the popularization of mobile Internet, the frequency of people acquiring and sending data is becoming more and more intensive, the means are becoming more and more diverse, and the requirements for real-time performance are also getting higher and higher. It can be said that information is available anytime, anywhere Interactive needs. [0003] The construction feature of construction projects is that the next process will cover the previous process. When there is a quality problem in the previous process, it is often necessary to deal with the previous process before proceeding to the construction of the next process, otherwise it will affect the quality of the building. Therefore, how to c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08G06F17/30
CPCG06Q10/103G06Q50/08
Inventor 吕秋君李书奇李书亭张奔
Owner 北京鸿游科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products