Fixture, and installation method of racing track steel bar
An installation method and steel bar technology, which is applied to the binding of skis, water skiing, sports accessories, etc., can solve the problems of time-consuming and labor-intensive, low installation accuracy, etc., and achieve the effect of accurate installation method, improved installation efficiency, and good overall effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as figure 1 and figure 2 As shown, this embodiment provides a fixture, which includes a stick-shaped main body 11, and a plurality of card slots 12 are provided along the length direction of the main body 11, including a first card slot, a second card slot, and a third card slot. slot, and the card slot 12 is composed of a first branch 13 fixed on the main body 11, a second branch 14 fixed on the main body 11, and the main body 11, wherein the first branch The length direction of the main body 13 and the second branch body 14 is perpendicular to the length direction of the main body 11, and the distance between the first branch body 13 and the second branch body 14 is greater than the diameter of the steel bar.
[0024] The fixture described in this embodiment includes a stick-shaped main body 11, which is convenient for users to use. A plurality of card slots 12 are provided along the length direction of the main body 11, including a first card slot, a second ca...
Embodiment 2
[0027] Such as figure 2 As shown, this embodiment provides a method for installing steel bars on a track, using the jig described in Embodiment 1 to install the steel bars on the track, and the steps are as follows: Step S1: Install the first condensing pipes along the track in sequence A steel bar and a second steel bar, and make the distance between the first steel bar and the second steel bar the same as the distance between the grooves; step S2: combine the first steel bar and the second steel bar The second steel bar is fixed in the first slot and the second slot in sequence, and then the third steel bar to be installed is inserted into the third slot, and the third steel bar is installed until the installation is completed ; Step S3: Install the fourth steel bar in sequence until all the steel bars are installed.
[0028] In the installation method of the track reinforcement described in this embodiment, in the step S1, the first steel bar and the second steel bar are ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

