Construction method of phc pipe piles under narrow site conditions
A technology of PHC pipe piles and construction methods, which is applied to sheet pile walls, manufacturing tools, and infrastructure engineering, and can solve problems such as project cost, quality, safety, large impact on progress, wide construction involvement, and difficult coordination
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] The construction method of the PHC pipe pile under the narrow site condition of the present invention comprises the following steps:
[0019] Step 1. According to the detailed construction drawings of PHC pipe piles, use a total station to accurately locate the position of PHC pipe piles, and the crane is accurately in place;
[0020] Step 2. Set the pile hammer on the main hook of the crane hook and communicate with the hydraulic system of the crane. The length of the hydraulic system pipeline meets the length requirements of the pipe pile at the highest point and the lowest point. Cooperate with the adjustment to ensure the stability of the crane station and the pile hammer can be driven accurately according to the measured pile position;
[0021] Step 3. Use the two-point lifting method to lift the pipe pile to the position of the pile hammer through the crane. At the pipe pile position, take the positioning point as the center of the circle, and dig a vertical shall...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com