Method for determining charging time of natural gas
A natural gas and pure gas technology, which is applied in earthwork drilling, measurement, wellbore/well components, etc., can solve problems such as determining the filling period of natural gas, and achieve the effect of avoiding errors and broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the purpose, technical solution and advantages of the present invention clearer, the embodiments of the present invention will be further described below in conjunction with the accompanying drawings.
[0025] Please refer to figure 1 , the embodiment of the present invention provides a method for determining the natural gas charging period, comprising the following steps:
[0026] Step S101, collecting core and cuttings samples from the analysis well, and using the collected core and cuttings samples to make a double-sided optical section of the fluid inclusion thin section;
[0027] Step S102, using a polarizing microscope to observe the thin slice of fluid inclusions prepared in step S101, to determine the type, occurrence and relative order of capture of pure gas phase natural gas inclusions;
[0028] Step S103, dividing the pure gas phase natural gas inclusions into different capture periods according to the occurrence and capture relative sequenc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com