Assembly and operation method for onsite repair of composite pipeline
A technology of composite pipes and composite pipes, which is applied in the field of on-site repair components of composite pipes, can solve problems such as secondary leakage and failure, and achieve the effect of improving construction efficiency and saving precious time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] On-site repair of reinforced thermoplastic composite pipe (DN100PN4MPa) with 10cm axial crack in the pipeline
[0040] Step 1: Select components, among which the length of the connecting nipple 6 is 50cm, and the conversion nipple 10 is DN80 to DN100; take the pipe crack as the center, and measure the length as 90cm (50cm is the length of the connecting nipple, and 40cm is 2 conversion pup lengths) damaged part of the pipe body and sawed. Grind the ends of the two pipelines to be repaired to keep them flush and flat.
[0041] Step 2: Use joint crimping equipment to crimp and connect the inner core tube and the outer tube to the end face of the pipe.
[0042] Step 3: Place the elastomer sealing ring on the outer end surface of the DN100 thread of the component conversion nipple, and screw the DN100 connector of the conversion nipple to the connecting sleeve through threads.
[0043] Step 4: Connect the repair pup joint to the conversion pup joint through threads, and t...
example 2
[0046] On-site repair of reinforced thermoplastic composite pipe (DN80PN6MPa) with 20cm axial crack at the pipeline bend (minimum bending radius is 2m)
[0047]Step 1: Select components, among which the length of the connecting nipple 6 is selected to be 200cm, and the conversion nipple 10 is selected to be DN80 to DN80; taking the pipe crack as the center, the measured length is 240cm (200cm is the length of the connecting nipple, and 40cm is 2 conversion pup lengths) damaged part of the pipe body and sawed. Grind the ends of the two pipelines to be repaired to keep them flush and flat.
[0048] Step 2: Use joint crimping equipment to crimp and connect the inner core tube and the outer tube to the end face of the pipe.
[0049] Step 3: Adjust the position of the pipeline to be repaired and the connecting sub to ensure that both ends are coaxial, and the bending radius of the pipeline to be repaired and the connecting sub of the component is greater than the minimum bending r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com