Suspension bridge tunnel type anchorage cable crane and construction method thereof

A tunnel-type, suspension bridge technology, applied in suspension bridges, bridge forms, bridges, etc., can solve problems such as limited hoisting height, and achieve the effect of reducing construction costs, enhancing applicability and versatility, and controlling safety risks

Inactive Publication Date: 2019-03-19
中铁大桥局集团第八工程有限公司
View PDF4 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects existing in the prior art, the purpose of the present invention is to provide a suspension bridge tunnel type anchorage cable crane, which can effectively solve the problem of the limited hoisting height of the positioning bracket and the tunnel anchor steel tie rod in the case of limited height in the cave.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Suspension bridge tunnel type anchorage cable crane and construction method thereof
  • Suspension bridge tunnel type anchorage cable crane and construction method thereof
  • Suspension bridge tunnel type anchorage cable crane and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

[0032] see figure 1 As shown, the embodiment of the present invention provides a suspension bridge tunnel anchorage cable crane, which is used for hoisting the positioning bracket 14 and the steel tie rod 15 in the tunnel during the construction process of the suspension bridge tunnel anchorage. The suspension bridge tunnel type anchor cable crane according to the embodiment of the present invention specifically includes an anchoring component and a hoisting component.

[0033] The anchoring assembly includes a door frame 1 located at the entrance of the cave, and a rock anchor 2 located on the back rock surface in the cave. The installation arrangement of the rock anchor 2 is as follows: figure 2 shown. see Figure 7 As shown, the gantry 1 includes a gantry beam 7 and two gantry columns 8 , and the gantry beam 7 is horizontally arranged o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a suspension bridge tunnel type anchorage cable crane and a construction method thereof and relates to the technical field of bridge hoisting construction. The suspension bridge tunnel type anchorage cable crane includes an anchoring assembly and a hoisting assembly, and the anchoring assembly comprises a gantry disposed at an opening and a rock anchor disposed on the rearrock surface in a hole. The hoisting assembly includes a bearing cable erected between the rock anchor and the top end of the gantry, a traction pulley and a traction cable for pulling the traction pulley are suspended below the bearing cable, and the lower end of the traction pulley is provided with a hook for hoisting a heavy object. The gantry includes a gantry cross beam and two gantry columns, the gantry cross beam is transversely disposed at the top of the two gantry columns, the gantry cross beam is provided with a lifting lug, and the lifting lug is connected with one end of the bearing cable. According to the suspension bridge tunnel type anchorage cable crane, the problem that the hoisting heights of a positioning bracket and a tunnel anchor steel pull rod are limited under the conditions that the height in a hole is limited can be effectively solved.

Description

technical field [0001] The invention relates to the technical field of bridge hoisting construction, in particular to a suspension bridge tunnel type anchorage cable crane and a construction method thereof. Background technique [0002] The construction contents of tunnel type anchorage of suspension bridge mainly include: primary support, installation of anchorage system, reinforced concrete construction of anchor plug body and secondary lining construction. Except for the installation of the anchoring system, the rest of the processes are required to be carried out in an orderly manner in the tunnel anchor. However, for suspension bridges whose main cable anchorage system is designed as high-strength prestressed steel tie rods and positioning brackets are designed as trusses, it is basically impossible to hoist the positioning brackets in pieces and the overall hoisting of steel tie rods in the tunnel anchor according to the traditional method. There are relatively few ap...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D11/02E01D21/10
CPCE01D11/02E01D21/10E01D2101/26
Inventor 李明欢罗志雄尚敏胡维东扆飞李云
Owner 中铁大桥局集团第八工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products