A technology of piling device and geotechnical engineering, which is applied in basic structure engineering, sheet pile wall, building and other directions, can solve the problems of poor installation stability, inability to realize piling operation, poor operability, etc., and achieves convenient placement and installation and simple installation process. Fast and efficient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] see Figure 1-3 , a piling device for geotechnical engineering, comprising a support plate 1, a fixed frame 6 is fixedly installed on the support plate 1, and the bottom of the support plate 1 is rotatably provided with traveling wheels 22, and the traveling wheels 22 are used to move the device as a whole, Enables piling to be carried out in different areas.
[0022] The fixed frame 6 is provided with an incomplete gear 10 in rotation, the fixed frame 6 is hung with a hanger 13 fixedly, and the vertical slide bar 12 is vertically slidable on the hanger 13, between the longitudinal slide bar 12 and the incomplete gear 10 A transmission rod 11 is hinged, and a stamping plate 16 is fixedly installed horizontally at the bottom of the longitudinal slide rod 12 , and the upper end of the transmission rod 11 is eccentrically hinged on the front of the incomplete gear 10 . The support plate 1 is horizontally slidably equipped with a mobile frame 17, and the mobile frame 17 is...
Embodiment 2
[0027] On the basis of Embodiment 1, the limit mechanism specifically includes a limit cover plate 25, a guide post 26 is slidably installed inside the limit cover plate 25, and a wedge-shaped surface abutting against the lower end of the pile body 15 is provided on the limit cover plate 25. , The limit spring 21 is arranged horizontally in the limit cover plate 25, and the two ends of the limit spring 21 are respectively fixed on the guide column 26 and the limit cover plate 25.
[0028] The pile body 15 passes through the installation hole 27 before piling, and the lower end of the pile body 15 abuts against the wedge-shaped surface of the limit sleeve plate 25. The abutting side clamping plate 24, under the elastic action of the limit spring 21, the side clamping plate 24 clamps the pile body 15 from both sides to achieve stability, and when the stamping plate 16 is punched downward, the pile body 15 passes through the limit. The force of the wedge-shaped surface of the cov...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com