Water jet dense comb-shaped hole drilling type to-be-tunneled roadway coal seam gas outburst elimination backing pump treatment method

A technology of coal seam gas and water jet, which is applied in the direction of gas discharge, earthwork drilling, safety devices, etc., and can solve problems such as affecting the effect of drainage and preventing outbursts, stuck buried drill accidents, and high cost

Active Publication Date: 2019-05-17
XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
View PDF6 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The effect of gas pre-extraction by using the drilling roadway to drill through the layers is the best, but the construction period is long and the cost is high; the economy and period of gas pre-extraction by using the directional long drilling holes along the coal seam are good, but the main problems The problem is that the coal seams of high-gas or outburst mines are relatively broken, and the directional long boreholes in construction are prone to hole c

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water jet dense comb-shaped hole drilling type to-be-tunneled roadway coal seam gas outburst elimination backing pump treatment method
  • Water jet dense comb-shaped hole drilling type to-be-tunneled roadway coal seam gas outburst elimination backing pump treatment method
  • Water jet dense comb-shaped hole drilling type to-be-tunneled roadway coal seam gas outburst elimination backing pump treatment method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] see figure 1 and 2 , shows the water jet intensive comb-shaped drilling type coal seam gas outburst pre-drainage treatment method to be excavated.

[0036] The water jet intensive comb-shaped drilling type coal seam gas outburst elimination and pre-drainage treatment method includes the following steps:

[0037] Step 1: Construction forms a directional long borehole, which may include the following sub-steps:

[0038] a. Determine the position of the directional long drilling, such as figure 1 As shown, the position of the directional long borehole 5 is determined according to the regional stratum data of the roadway to be excavated. 2 extends below the coal seam roof 1, the coal seam floor 3 extends below the coal seam 2 of the roadway to be excavated, the directional long borehole 5 is located in the coal seam floor 3, preferably in a relatively stable rock formation of the coal seam floor 3, the The direction of extension of the directional long borehole 5 is the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a water jet dense comb-shaped hole drilling type to-be-tunneled roadway coal seam gas outburst elimination backing pump treatment method which comprises the following steps: I,constructing orientated long drilling holes; II, constructing water jet dense comb-shaped holes; III, sealing holes, and extracting and exploring gases. By adopting the method, very small radius water jet dense comb-shaped branched holes are constructed in a bottom plate of a to-be-tunneled roadway in an underground coal mine, hole drilling depths of single branch holes are reduced, the number ofbranch holes is greatly increased, the coal layer permeation improvement and gas extracting and discharge effects of the orientated long drilling holes are improved, the purpose of to-be-tunneled roadway coal seam gas backing pump outburst elimination can be achieved, and safe tunneling of a coal seam roadway is ensured.

Description

technical field [0001] The invention relates to the technical field of coal seam gas control, in particular to a water jet intensive comb-shaped drilling type coal seam gas outburst pre-extraction control method for roadway to be excavated. Background technique [0002] With the increase of coal mining depth in my country, the in-situ stress, gas gradient, gas content and gas emission volume continue to increase, high-gas mines and outburst mines are also increasing, and the frequency and intensity of coal and gas outbursts and gas overruns are also increasing. Therefore, it is necessary to take measures to prevent coal and gas outburst and gas overrun in underground coal roadway excavation. The pre-extraction of gas by drilling is an effective means to control gas outburst and overrun. At present, the main method of gas control in the coal roadway to be excavated is to first construct the gas drainage rock roadway in the coal roadway floor rock layer, and then construct the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21F7/00
Inventor 张金宝王力王毅徐保龙金新
Owner XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products