Coal-bed gas well short frontal distance from target point horizontal well integration process method
A technology for coalbed methane wells and process methods, which is applied in wellbore/well components, production fluids, directional drilling, etc., and can solve problems such as matching use and lack of reservoir stimulation technology.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0054] A method for the integration of horizontal wells with short target front distance in coalbed methane wells, comprising the following steps:
[0055] (1) Wellbore preparation;
[0056] a. Determine the state of the well connection, and determine the downhole working conditions of old wells in inclined and straight wells; under normal circumstances, there are 5-1 / 2” steel casings to the wellhead in old wells in inclined and straight wells, and the return height of cementing cement is generally about 300m. There are 2-7 / 8" oil pipes, oil suction pipes, and conventional drainage pumps to the vicinity of the target coal seam.
[0057] b. Downhole actual exploration: After connecting the well, take out the original downhole tools, drill down to investigate the downhole situation, and drill the cement slurry to seal the perforation section of the original reservoir;
[0058] C. Well scraper: Run the well gauge and scraper, scrape the pipe repeatedly at the expected position o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com