Black-start scheme optimization method based on Vague set
A scheme optimization, black start technology, applied in the field of power system, can solve problems such as difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] Let the m alternatives of the black start decision be a 1 ,a 2 ,...,a m , n evaluation indicators are c 1 ,c 2 ,...,c n , the specific steps for optimizing the black start scheme based on the Vague set are as follows:
[0014] Step 1. Form a black start decision matrix;
[0015] According to the state and parameters of the equipment in the power system, the black start scheme to be evaluated is formed, the appropriate evaluation index is selected, and the single value data is converted into vague value data by using the following two formulas:
[0016] income index
[0017] cost index
[0018] In the formula: a ij and z ij plan a i In the evaluation index c j Vague value and single value data under ; z jmax and z jmin for index c j The theoretical maximum and minimum values of ; the superscript p represents the p-th power of the index value (2, 3, 4, ... can be taken).
[0019] Finally, the Vague value decision matrix R is obtained:
[0020]
[...
PUM