A test method and scaffolding technology, which is applied in the testing of mechanical components, testing of machine/structural components, and the use of stable tension/pressure to test the strength of materials, etc. Unpredictable frame failure and other issues, to achieve the effect of providing safety and reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0032] During the excavation of the pilot tunnel, the top scaffolding is firstly used to support the top of the cave body to prevent construction accidents such as collapse. The top scaffolding needs to meet the structural requirements such as strength and rigidity to achieve the supporting function. However, at present, most of the structural strength of the scaffolding is obtained through structural calculation or construction experience. There is no test and verification process for the actual stress state of the scaffolding, and there may be waste of scaffolding structural strength or the scaffolding structure cannot meet the requirements. Support stability requirement...