Mounting method of fabricated wall
An installation method and assembly technology, applied in the field of building materials, can solve the problems of low assembly efficiency and poor structural stability of wall units, and achieve the effect of improving assembly efficiency and structural stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] Such as figure 1 As shown, the present invention provides a prefabricated wall body, which includes a first wall surface and a second wall surface, and also includes a filler plate 4 arranged between the first wall surface and the second wall surface. Wherein, the first wall and the second wall are connected by a two-way buckle 1; the first wall includes a plurality of end-to-end connected first wall subunits, and the first wall subunit includes a first keel 22 and a first wall subunit. The first gypsum board 21 arranged on the first keel 22; the second wall surface includes a plurality of second wall subunits connected in sequence, and the second wall subunit includes a second keel 32 and is arranged on the second keel 32 31 of the second plasterboard.
[0054] In the specific operation, the above-mentioned first keel 22 and the second keel 32 can be set as vertical keels, and corresponding horizontal keels are auxiliary provided to realize the stable connection opera...
Embodiment 2
[0071] Embodiment 2 of the present invention provides a prefabricated wall. The main structure is similar to that of Embodiment 1. For the description of the main structure, please refer to the description of Embodiment 1. The purpose here is to explain the differences between the two.
[0072] to combine Figure 9 , Figure 10 As shown, in this embodiment, the head end of the first gypsum board 21 in the first wall subunit overlaps the first keel in the front adjacent first wall subunit, and is adjacent to the front first wall The tail ends of the first gypsum boards in the face subunit are connected; the tail ends of the first gypsum board 21 in the first wall subunit are overlapped on the first keel 22 in the current first wall subunit, and are connected to the rear The head ends of the first gypsum boards in the adjacent first wall subunits are connected.
[0073] Correspondingly, the first end of the second gypsum board 31 in the above-mentioned second wall subunit over...
Embodiment 3
[0076] Embodiment 3 of the present invention provides an installation method applied to the prefabricated wall described in Embodiment 1 or Embodiment 2, including the following steps:
[0077] Step a: connecting a plurality of first wall subunits end to end and installing them at a preset position; Step b: setting the filler plate on the side of the first wall subunit close to the second wall subunit to be installed; step c : Connect the first end of the two-way buckle to the first keel in the first wall subunit; step d: attach multiple second wall subunits to the corresponding two-way buckle through the second keel on the second end.
[0078] In the specific operation, step a further includes: installing the sky and earth keel and the side keel on the first wall to preset positions, so as to realize the connection and fixing operation of the first wall.
[0079] Correspondingly, step d also includes: installing the sky and earth joists and side joists on the second wall to ...