Optimal outage maintenance method based on bpnn maintenance demand index analysis
A maintenance demand and index technology, applied in the field of electric power, can solve the problems of no objective, quantified and perfect evaluation methods, and achieve the effect of improving electricity satisfaction and power supply reliability, avoiding frequent power outages, and improving maintenance efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The technical idea adopted in this specific embodiment is: by adopting the idea of constructing a hierarchical structure tree to establish the topology structure of the power grid, and analyzing the mutual influence relationship between various devices in the power grid according to the tree structure, the influence scope of a certain power outage maintenance is obtained. And based on this scope of influence, all the equipment for this outage maintenance are obtained, and then based on the Back Propagation Neural Network (BPNN, Back Propagation Neural Network), the maintenance demand index of these equipment is analyzed, and the optimal outage maintenance plan is formulated based on this. Its process includes the following steps:
[0024] S1. Establish a power grid network topology structure;
[0025] S2, based on the power grid network topology, find out the auxiliary stop equipment associated with the equipment that must be checked;
[0026] S3. Calculate the maint...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


