Pulse neutron oxygen activation water absorption profile test device and construction technology in offshore platform
A technology of pulsed neutron and water absorption profile, applied in wellbore/well components, construction, earth-moving drilling, etc., can solve the problem of inability to carry out oxygen activation test and construction, and achieve the effect of wide field application prospects.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment 1, with reference to attached Figure 1-3 , a pulse neutron oxygen activated water absorption profile test device in the offshore platform mentioned in the present invention, its technical solution is: comprising a construction tower 1, a blowout preventer 2, a wax removal gate 3, a ground pulley 4, and a blowout prevention box 5 , sky pulley 6, blowout preventer 7, steel wire winch 8; a fixed construction tower 1 is installed above the wax removal gate 3 of the oil tree 9, and a blowout preventer 2 is installed on the inside of the tower to connect with the wax removal gate 3, and the blowout preventer The ground pulley 4 is installed under the blowout prevention nipple, and is connected to the lower end of the blowout prevention pipe 7 through a union. The blowout prevention box 5 is installed at the upper end of the blowout prevention pipe. Press the pipeline, and install the overflow pipeline on the quick interface at the upper end of the outer side; the ...
Embodiment 2
[0036] Embodiment 2, with reference to attached Figure 4 , a pulse neutron oxygen activation water absorption profile test device for water injection wells in the confined space of offshore platforms mentioned in the present invention;
[0037] A fixed construction tower is installed above the wax removal gate of the oil tree, and a blowout preventer is installed on the inside of the tower to connect with the wax removal gate. Blowout prevention box, sky pulley is installed on the upper part of the blowout prevention box, the pressure pipeline is installed on the quick interface at the lower end of the outer side of the anti-blowout box, and the overflow pipeline is installed on the quick interface at the upper end of the outer side;
[0038] The steel wire cable is released from the drum of the hydraulic winch, and after being guided by the upper pulley of the BOP, it is guided upward by the sky pulley for a second time, and then passed downward to the spray box and connecte...