Digitalized construction management system based on BIM model

A technology of construction management and engineering management, applied in image data processing, data processing applications, 3D modeling, etc., can solve problems such as high requirements for professional ability, time-consuming, and high-cost problems, so as to reduce learning time, Reduced errors, easy to obtain effects

Active Publication Date: 2019-08-02
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It is difficult to understand the construction technology through words and construction diagrams, and it has high requirements for professional ability. It is not convenient to check in time when encountering problems, and the effect is not ideal; The on-site learning personnel are limited, and it takes a lot of time, and the degree of mastery varies from person to person, so there are many uncertain factors
Moreover, due to the different construction projects, managers need a lot of time to write plans, and managers usually rely on work experience to write construction plans, which can easily lead to unreasonable construction plans. When unreasonable construction plans appear, it takes a lot of time Correction of time, manpower and material resources will affect project acceptance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Digitalized construction management system based on BIM model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of the invention. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and / or" includes any and all combinations of one or more of the ass...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of engineering project management, in particular to a BIM (Building Information Modeling) model-based digital construction management system. The system comprises a model establishment module, a construction simulation module, a consrtruction management platform, a constructor terminal and a manager terminal. The model establishment module is used for establishing a three-dimensional model with multiple construction members and importing construction tasks to corresponding construction members. The construction simulation module is used for simulating construction tasks and sending a most appropriate construction scheme to the model establishment module. The engineering management platform is used for combining the BIM model establishment submodule and the construction task establishment submodule and generating a three-dimensional simulation engineering model. The constructor terminal is used for learning virtual construction operation of constructors and filling construction information. The manager terminal is used for checking the construction task and modifying the construction plan. The construction scheme can be conveniently formulated by auxiliary managers, and construction time and quality of constructors can be improved.

Description

technical field [0001] The invention relates to the technical field of engineering project management, in particular to a digital construction management system based on a BIM model. Background technique [0002] Construction project management is a complex systematic work, especially for large-scale projects, including process control, personnel information control, budget control and so on. Building Information System (BIM) was proposed by Autodesk in 2002 and is a building information tool widely used in the field of construction. Based on 3D digital technology, the building information model inherits the engineering data model of various related information of the construction project, and is the digital expression of the entity and functional characteristics of the project facilities. A complete building information model, which can associate data, processes and resources in different stages of the construction project life cycle (design, construction, operation), is a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06T17/10
CPCG06Q10/0633G06Q10/103G06Q50/08G06T17/10
Inventor 孙辉陈孝强王建军杜海龙马文安林广泰罗伟陆进李雍友蒋严波吴刚刚杨茗钦邓李坚韦永奎程立飞
Owner GUANGXI ROAD & BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products