technical field
[0001] The invention relates to the field of tunnel engineering construction, in particular to a structural system for controlling the deformation of a subway shield tunnel and a construction method thereof. Background technique
[0002] With the large-scale development of urban rail transit and the development and construction of municipal facilities, there are more and more projects to build new structures such as underground squares or transfer centers in the area above the operating subway. The traditional construction method is to add mixing piles to the construction area. The surrounding soil of the shield tunnel is reinforced, and then the foundation pit is enclosed, which can prevent the lateral movement of the soil from affecting the side wall of the shield area to a certain extent, but this maintenance method has great disadvantages. For example, the pile maintenance structure around the shield tunneling area only maintains the shield tunneling area...